Roadmap
Roadmap
One platform, multiple markets. Vertical-by-vertical rollout aligned with critical infrastructure operator needs.
WP 01 · 2026
Phase 1 — Thermal inspection: solar and pipelines
Active
- Autonomous thermal detection — panels and leaks
- Ground station with real-time mission control
- Geolocated automatic PDF report
- Pipeline pilot in preparation
- Field validation — Q4 2026
WP 02 · 2027
Phase 2 — Long-range BVLOS operations
Planned
- Autonomous flight corridor over linear infrastructure
- BVLOS authorization — Transport Canada
- High-voltage line inspection
- Onboard obstacle avoidance
- Extended payloads — LiDAR, multispectral
WP 03 · 2028+
Phase 3 — Substations & gas detection
Future
- Thermal inspection of HV equipment
- SF6 leak detection (gas sensor)
- Predictive failure analysis
- SCADA / management system integration
WP 01 · 2026
Phase 1 — Thermal inspection: solar and pipelines
Active
- Autonomous thermal detection — panels and leaks
- Ground station with real-time mission control
- Geolocated automatic PDF report
- Pipeline pilot in preparation
- Field validation — Q4 2026
WP 02 · 2027
Phase 2 — Long-range BVLOS operations
Planned
- Autonomous flight corridor over linear infrastructure
- BVLOS authorization — Transport Canada
- High-voltage line inspection
- Onboard obstacle avoidance
- Extended payloads — LiDAR, multispectral
WP 03 · 2028+
Phase 3 — Substations & gas detection
Future
- Thermal inspection of HV equipment
- SF6 leak detection (gas sensor)
- Predictive failure analysis
- SCADA / management system integration